MGMT 625 Quiz 2

MGMT 625 Quiz 2

  1. The ___________________ usually represents activities that have zero float/slack.
  2. Individuals that the organization employs to perform tasks for the operation and/or projects are referred to as
  3. Quality assurance, design engineering, shipping and receiving, and legal advisory are all examples of:
  4. WBS is
  5. The amount of time an activity’s start can be delayed without affecting the overall project is
  6. refers to the overall number of resources required for a work activity within a specified time.
  7. The activity information checklist should include the following information
  8. What two ways does a project manager have to design extra time on a project for particular work activities that may require special attention?
  9. All resources present two main constraints to a project:
  10. A compilation of completed work activities to form a final product identified by the customer as accomplishing an objective
  11. This estimating process allows the use of both optimistic and pessimistic values to calculate an expected duration.
  12. Resources acquired by the organization used to carry out the activities of business and accomplish the strategic objectives of the organization are
  13. Indirect project resources might be used during the course of project work activities but are not allocated to particular work package activity.
  14. Activity organization has to be designed at two levels:
  15. What are the four activity relationships based on activity dependency?
  16. Activity definition is the most critical phase of the project life cycle because
  17. In most cases, work authorization and spending are the responsibility of
  18. When a risk with a high probability or high impact to the project is identified, extra time should be calculated into the activity to compensate. This is called:
  19. Program resource estimating is used mainly in high level organizations
  20. What are the elements of the triple constraint?
  21. Which is not one of the primary components for information gathering?
  22. Two processes are used to evaluate work activities for diagramming a network:
  23. Authorization for scheduling falls under two general categories:
  24. The _______________ relationship simply establishes one or more activities that need to be completed before the next activities connected in the network.
  25. When using the Activity-on-Node diagram, activities can be used multiple times within the diagram